Home   |   About Us   |   Accreditation   |   Case Studies   |   Videos   |   News   |   Contact Us
Product Information
Case Studies
 6 Water Treatment Works Upgrade
 Fane Valley Effluent Treatment Plant
 Fermanagh Villages Sewage Scheme
 Hilton Hotel Malta wastewater solution
 Libyan Oil Fields - temporary wwtp
 MBR - Quality Eggs, Ireland
Downloads
 KLARO Sewage plant (97.5% removal)
 Mobile Sewage Treatment Plants
 Biosam for small communities
 Klaro EN12566-3 Certification
 Mini-Klaro EN12566-3 Certification
 Mini-Klaro Sewage plant (95% removal)
 Penstock installation reference list

Wastewater Treatment


Fermanagh Villages Sewage Scheme
   
Client:
Completion date:
Contract Value:
NI Water, Northern Ireland
01/08/2003
1.7 million
   
Project Overview:

Installation of complete new sewage treatment facilities for 6 no. village schemes in Co. Fermanagh: Ederney, Derrygonnelly, Clabby, Clogher, Lack and Roslea. Work involved the simultaneous installation of new equipment on all six sites while maintaining the existing works and ensuring continuous treatment of sewage. Populations ranged from 240 p.e. to 1200 p.e.

   
Scope Of Work:

New plant supplied at each site included forward feed sewage pump stations, inlet screening, flow measurement, flow control, primary settlement, biological treatment using RBCs, final settlement, sludge pumping, sludge holding, storm retention tanks and pumping stations, central control panels, cabling, pipework and all associated civils work.

 
 