Home   |   About Us   |   Accreditation   |   Case Studies   |   Videos   |   News   |   Contact Us
Pumps & Pumping
  Ballybay Flood Defence Scheme
  Knightsbrook Hotel Foul Drainage
  NI Water septicity dosing
  River Fergus, Ennis Flood Scheme
  Newtownards Flood Relief Scheme
  Munster Blackwater Flood Drainage
  Croke Park Stormwater Pumping
Wastewater Treatment
  6 Water Treatment Works Upgrade
  Fane Valley Effluent Treatment Plant
  Fermanagh Villages Sewage Scheme
  Hilton Hotel Malta wastewater solution
  Libyan Oil Fields - temporary wwtp
  MBR - Quality Eggs, Ireland
Stormwater Management
  Topaz Filling Station
  Newtownards Flood Relief scheme
  Rapid Build Schools, Ireland
  KFC Inverness, Scotland
  Mell Housing, Ireland
  Lidl Supermarket Group
Grease Management
  Dublin FOG Management Plan
  International Airports
  McDonalds Eastern Europe
  Grease Guardian Paris
Services
  Louth Co Council Asset Management
  Wexford Co Council Pump Framework
  NI Water - NIW C057 Framework



Case Studies


Ballybay Flood Defence Scheme
   
Client:
Completion date:
Contract Value:
Monaghan County Council (Irish Bridge Company 0873515124)
January 2015
30,000
   
Project Overview:

Monaghan County Council commissioned the Housing Agency to investigate and propose a design solution for a section of the Dromore River in Ballybay, Co. Monaghan which suffered damage as a result of a flood event that occurred in the early hours of Sunday 23rd October 2011. The flood caused a section of retaining wall immediately upstream of the masonry arch bridge on the R183 at Hall St to collapse into the river and also resulted in the river surcharging upstream with flood waters overflowing into the nearby fair green housing estate causing 12 sheltered housing units for the elderly to be inundated to a depth in excess of 600mm.

 

The project involved providing a new pumping station along the bank of the Dromore River 5 l/s including controls, overflow screening, flowmeter and associated equipment.  FM Environmental Ltd was responsible for the M&E works involved in the project as detailed below.

   
Scope Of Work:

Supply, installation, testing and commissioning of 1nr Pumping Station:

  • 2 No. Xylem Submersible Pumps 2kW
  • Pipework, valves and fittings  80mm Diameter
  • MCC’s c/w PLC/HMI Housed in Weatherproof GRP Kiosks
  • Welfare Facilities
  • 80mm Diameter Flowmeter
  • NX11 Telemetry Unit
  • Site Instrumentation
  • Street Lighting

 
 