Home   |   About Us   |   Accreditation   |   Case Studies   |   Videos   |   News   |   Contact Us
Product Information
Case Studies
  Ballybay Flood Defence Scheme
  Knightsbrook Hotel Foul Drainage
  NI Water septicity dosing
  River Fergus, Ennis Flood Scheme
  Newtownards Flood Relief Scheme
  Munster Blackwater Flood Drainage
  Croke Park Stormwater Pumping
Downloads
 River Fergus Ennis Flood scheme
 Holywood Wastewater pumping station
 Fermoy Phase II flood alleviation
 Drumbeg Drive WWPS detail of works
 FME packaged pump stations
 Most common pump impellers
 OXY-FLO Septicity Dosing
 Major pumping station schemes
 The portfolio of pumping stations
 Family size Pumping Substation
 TeTec Remote Pump Monitoring

Pumps and Pumping


Croke Park Stormwater Pumping
   
Client:
Completion date:
Contract Value:
Haughton & Young for Croke Park
01/09/2010
75,000
   
Project Overview:

The project enabled the relief of flooding problems at the Croke Park GAA football stadium in Dublin. Work included the design, supply and installation of the main storm pump station and the upgrade of four small drainage pump stations that pump to it. The main 4-pump storm relief pump station operates on Duty/Assist/Assist/Standby

Flow rates of pumps:   4 No. Flygt pumps each rated at 148 l/s (443 l/s peak flow)

   
Scope Of Work:

4 No Submersible pumps complete with pipework, valves, MCC, Ultrasonic controls. Refurbishment and upgrade of four outlying feeder pump stations including all pumps, pipework and controls.

   
 