November 2009: Final commissioning of a 600 PE Biosam UT treatment plant in Libya. The system uses an existing septic tank as primary settlement, and pumps up the settled wastewater to two media tanks which are followed by two hopper tanks. The effluent goes through sand filtration and chlorination to make it useable as second class water for irrigation.